Product code
1805
Typology
Wall Cladding
Material
LVT
Collection
Color
Feeling to the touch
Stone
Layin
Permanent
Features
Easy maintenance
Easy to clean
Washable
Does not require waxing
Easy and simple installation
Clean installation
Moisture resistant
Recommended uses
Multipurpose function rooms
Theatres
Hostels
Hotel rooms
Conference Centres
Hotels
Car showrooms
Shops
Showrooms
Supermarkets
Public conveniences
Offices
Server rooms
Data Centres
Nurseries
Lecture halls
Libraries
Schools
Bars
Industrial Kitchens
Fast food outlets
Canteens
Restaurants
Take aways
Fitness areas
Sports centres
Gyms
Changing Rooms
Available formats
Plank
format code: EVVPV18X36X1805
Larghezza
457.2 mm
Lenght
914.4 mm
Thickness
1.8 mm
Pack
4.18 m2
Weight
3.5 kg/m2
Evolution Vertical

Evolution Vertical

A gorgeous and functional surface, especially designed for interior wall cladding, which adapts to any setting. Great looks combined with high water resistance and quick, easy installation: CE-certified, it's the ideal line for renovations.

Usage classes and classifications

Material Composition

LVT vinyl wall cladding in staves/tiles

wear layer in pure and transparent PVC 0.07 mm

decoration layer in pure PVC 0.10mm (printed with innovative techniques)

support layer in PVC 1.63 mm

The components are heat-assembled on a non-continuous press.

Material Composition
Installation instructions

The laying surface must be flat, smooth, dry, firm, free of grease and cracks and maintain these characteristics over time. During installation, ambient temperature must be at least + 18 ° C and this temperature must be maintained for at least 2 days after work completion. Installation is carried out with easy-spread glue using suitable adhesives according to the manufacturers' instructions. Maximum permissible residual humidity of the substrate is ≤ 2%. Condition the unpacked material for at least 48 hours within the rooms where it will be installed. Use of adhesives specifically for wall LVT on appropriate substrates is advised. If installing within humid environments, use of water-resistant smoothing compounds, adhesives and protective finishes is imperative.

Installation instructions
Cleaning and maintenance

Cladding can be used 48 hours after installation completion. Clean with a damp cloth. Use neutral detergents only. After years of use, if necessary, restore surface with a protective, water-resistant finish.

Cleaning and maintenance
Downloads
Show all downloads

Contact us for any information about our products

You may also be interested in...
Buflon Textile Vinyle
Buflon Textile Vinyle
Una collezione di rivestimenti murali certificati CE, con una varietà di decori e texture ispirati al mondo del design
Buflon Mousse
Buflon Mousse
Un rivestimento murale versatile, grazie alle sue caratteristiche uniche: bello da vedere e con una varietà di decori
Evolution Panel
Evolution Panel
A system of technical false walls and false ceilings with high acoustic absorption capacity
Evolution Wall
Evolution Wall
Un sistema di contropareti e controsoffitti bello da vedere e pratico, a prova di quotidianità.

Privacy policy and cookie management

This site uses third-party profiling cookies to send you targeted advertising messages and services in line with your preferences. If you want to learn more or opt out of all or some cookies, read the extended information on cookies.
You consent to the use of cookies in order to continue browsing.
You are using an outdated browser.

To view the Virag site correctly, please use the new Microsoft browser Edge or install Google Chrome
OK